A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
To obtain the License Renewal (LR) for the Long-Term Operation (LTO) of a Nuclear Power Plants (NPPs) is important ensuring the integrity of Structures, Systems, and Components (SSCs). Additionally, the SSCs must continue to perform their intended functions under Design Extended Conditions (DEC). D...
Saved in:
| Main Authors: | Maritza Rodríguez Gual, Jorge Armando P. Junior |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Brazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR)
2025-06-01
|
| Series: | Brazilian Journal of Radiation Sciences |
| Subjects: | |
| Online Access: | https://bjrs.org.br/revista/index.php/REVISTA/article/view/2636 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design and validation of a psychosocial well-being scale (BPS) for high school students
by: José Manuel Solís-Miranda, et al.
Published: (2024-11-01) -
w-extending and pw-extending Modules
by: Habit K. Mohammad ali, et al.
Published: (2023-01-01) -
Long-term Stochastic Forecasting of the Nuclear Energy Global Market
by: Vladimir Kharitonov, et al.
Published: (2015-06-01) -
PUBLIC-PRIVATE PARTNERSHIP IN NUCLEAR ENERGY: THE USA EXPERIENCE
by: Yu. V. Chernyakhovskaya, et al.
Published: (2017-10-01) -
Extending Long‐Term Avian Studies Alters Temporal and Climate‐Driven Trend Conclusions
by: Irene Zanandrea, et al.
Published: (2025-08-01)