A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation
To obtain the License Renewal (LR) for the Long-Term Operation (LTO) of a Nuclear Power Plants (NPPs) is important ensuring the integrity of Structures, Systems, and Components (SSCs). Additionally, the SSCs must continue to perform their intended functions under Design Extended Conditions (DEC). D...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Brazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR)
2025-06-01
|
| Series: | Brazilian Journal of Radiation Sciences |
| Subjects: | |
| Online Access: | https://bjrs.org.br/revista/index.php/REVISTA/article/view/2636 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|