A new methodology to identify Structures, Systems, and Components needed to cope with Design Extended Conditions in the scope of a Nuclear Power Plant Long Term Operation

To obtain the License Renewal (LR) for the Long-Term Operation (LTO) of a Nuclear Power Plants (NPPs) is important ensuring the integrity of Structures, Systems, and Components (SSCs). Additionally, the SSCs must continue to perform their intended functions under Design Extended Conditions (DEC). D...

Full description

Saved in:
Bibliographic Details
Main Authors: Maritza Rodríguez Gual, Jorge Armando P. Junior
Format: Article
Language:English
Published: Brazilian Radiation Protection Society (Sociedade Brasileira de Proteção Radiológica, SBPR) 2025-06-01
Series:Brazilian Journal of Radiation Sciences
Subjects:
Online Access:https://bjrs.org.br/revista/index.php/REVISTA/article/view/2636
Tags: Add Tag
No Tags, Be the first to tag this record!