Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number
In order to analyze the risk status and change trend of high-risk operation in hydropower projects,considering the complexity and uncertainty of the evaluation system,this paper proposes a five element connection number analysis method for risk assessment of high-risk operation in hydropower project...
Saved in:
Main Author: | ZUO Hengyi |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2021-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.06.018 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research and Practice on the Influence of Hydropower Station Construction on River Connectivity in the Process of Urbanization
by: WANG Shenfang, et al.
Published: (2022-01-01) -
Evaluation Method of Regional Water Resources Carrying Capacity Based on Connection Number
by: DONG Tao
Published: (2021-01-01) -
Modeling Factors Influencing Project Financing Risk
by: Gholamreza Sharafi, et al.
Published: (2024-03-01) -
ASSESSING THE IMPACT OF RISK MANAGEMENT COMPONENTS ON CONSTRUCTION PROJECT PERFORMANCE IN MOROGORO MUNICIPAL COUNCIL, TANZANIA
by: Aurelia Ngirwa Kamuzora
Published: (2024-12-01) -
TYPES OF RISKS WITHIN PROJECTS
by: Irina Andreea PEGULESCU
Published: (2024-05-01)