Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number

In order to analyze the risk status and change trend of high-risk operation in hydropower projects,considering the complexity and uncertainty of the evaluation system,this paper proposes a five element connection number analysis method for risk assessment of high-risk operation in hydropower project...

Full description

Saved in:
Bibliographic Details
Main Author: ZUO Hengyi
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2021-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.06.018
Tags: Add Tag
No Tags, Be the first to tag this record!