Change in traffic volumes in construction work zones

The problem of bottlenecks on the road network is relevant, especially in cities with radial and radial-ring schemes, since in case of their occurrence on arterial radial streets, it is difficult to choose an alternative route due to the low capacity of secondary streets. One of these bottlenecks is...

Full description

Saved in:
Bibliographic Details
Main Authors: Roman Rohalskyy, Romana Bura
Format: Article
Language:English
Published: Lviv Polytechnic National University 2024-12-01
Series:Transport Technologies
Subjects:
Online Access:https://science.lpnu.ua/tt/all-volumes-and-issues/volume-5-number-2-2024/change-traffic-volumes-construction-work-zones
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841553422198767616
author Roman Rohalskyy
Romana Bura
author_facet Roman Rohalskyy
Romana Bura
author_sort Roman Rohalskyy
collection DOAJ
description The problem of bottlenecks on the road network is relevant, especially in cities with radial and radial-ring schemes, since in case of their occurrence on arterial radial streets, it is difficult to choose an alternative route due to the low capacity of secondary streets. One of these bottlenecks is the repair work area, where, due to the closure of one street, the detour is carried out by parallel routes, which increases the load on local streets and driveways. Traffic flow volumes in the repair work areas are investigated in this paper. A site was selected where repairs were carried out in 2023. A citywide street of signalized traffic was closed due to repair work. The authors have forecasted the volumes of traffic flow that will be moving. After the start of the repair work, the actual traffic volume was determined by field surveys. The research was conducted over three months. The results showed that in the first week, the volumes were 2% higher than predicted; in the second week, they corresponded to the predicted values, and starting from the third week, they began to decrease. Approximately the same volumes were observed between the seventh and twelfth weeks of the study. They were 18% lower than forecasted at the beginning of the study. Since the research results showed that drivers need about a month to choose an alternative route to bypass the most congested sections of the road network, a recommendation was made to install road signs informing about the detour a month before the start of the repair work. In our opinion, this recommendation will allow drivers to plan and choose an alternative detour route in advance so that the detour section is less congested at the beginning of the repair work.
format Article
id doaj-art-fd90869a1b9743bd910ae3a7047c05db
institution Kabale University
issn 2708-2199
2709-5223
language English
publishDate 2024-12-01
publisher Lviv Polytechnic National University
record_format Article
series Transport Technologies
spelling doaj-art-fd90869a1b9743bd910ae3a7047c05db2025-01-09T10:31:10ZengLviv Polytechnic National UniversityTransport Technologies2708-21992709-52232024-12-0152142210.23939/tt2024.02.014Change in traffic volumes in construction work zonesRoman Rohalskyy0https://orcid.org/0000-0001-8223-2320Romana Bura1https://orcid.org/0000-0003-1027-8367Lviv Polytechnic National UniversityLviv Polytechnic National UniversityThe problem of bottlenecks on the road network is relevant, especially in cities with radial and radial-ring schemes, since in case of their occurrence on arterial radial streets, it is difficult to choose an alternative route due to the low capacity of secondary streets. One of these bottlenecks is the repair work area, where, due to the closure of one street, the detour is carried out by parallel routes, which increases the load on local streets and driveways. Traffic flow volumes in the repair work areas are investigated in this paper. A site was selected where repairs were carried out in 2023. A citywide street of signalized traffic was closed due to repair work. The authors have forecasted the volumes of traffic flow that will be moving. After the start of the repair work, the actual traffic volume was determined by field surveys. The research was conducted over three months. The results showed that in the first week, the volumes were 2% higher than predicted; in the second week, they corresponded to the predicted values, and starting from the third week, they began to decrease. Approximately the same volumes were observed between the seventh and twelfth weeks of the study. They were 18% lower than forecasted at the beginning of the study. Since the research results showed that drivers need about a month to choose an alternative route to bypass the most congested sections of the road network, a recommendation was made to install road signs informing about the detour a month before the start of the repair work. In our opinion, this recommendation will allow drivers to plan and choose an alternative detour route in advance so that the detour section is less congested at the beginning of the repair work.https://science.lpnu.ua/tt/all-volumes-and-issues/volume-5-number-2-2024/change-traffic-volumes-construction-work-zonestraffic flowfield researcharterial streettraffic volumetraffic forecastingroad networktraffic capacity
spellingShingle Roman Rohalskyy
Romana Bura
Change in traffic volumes in construction work zones
Transport Technologies
traffic flow
field research
arterial street
traffic volume
traffic forecasting
road network
traffic capacity
title Change in traffic volumes in construction work zones
title_full Change in traffic volumes in construction work zones
title_fullStr Change in traffic volumes in construction work zones
title_full_unstemmed Change in traffic volumes in construction work zones
title_short Change in traffic volumes in construction work zones
title_sort change in traffic volumes in construction work zones
topic traffic flow
field research
arterial street
traffic volume
traffic forecasting
road network
traffic capacity
url https://science.lpnu.ua/tt/all-volumes-and-issues/volume-5-number-2-2024/change-traffic-volumes-construction-work-zones
work_keys_str_mv AT romanrohalskyy changeintrafficvolumesinconstructionworkzones
AT romanabura changeintrafficvolumesinconstructionworkzones