Application of Concrete Cutoff Wall to Cofferdams Upstream and Downstream a Hydropower Station
Saved in:
Main Author: | YANG Fu-qiang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2009-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47662032&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design of Earth-rock Cofferdam in Phase Two of Bajiangkou Hydropower Station in Guijiang River
by: ZHOU Wan-wen
Published: (2009-01-01) -
Anti-seepage Measures for Earth-rock Cofferdam of Gaofengshan Hydropower Station and Its Construction
by: 何育文, et al.
Published: (2004-01-01) -
Application of Concrete Cutoff Wall to Extended Tiegang Reservoir Project
by: WU Shu-hong
Published: (2009-01-01) -
Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
by: LIU Congcong, et al.
Published: (2021-01-01) -
Application of Plastic Concrete in the Cutoff Wall of Fengtinghe River Main Dyke
by: 陈开凡
Published: (2001-01-01)