Modified Finance-Based Scheduling with Activity Splitting
Construction contractors often rely on external funding to manage financial deficits caused by irregular cash inflows and outflows. To address these cash flow challenges, contractors typically adjust the start times of project activities to prevent shortages while minimizing the overall project dura...
Saved in:
Main Authors: | Sameh Al-Shihabi, Ashraf Elazouni |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-01-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/13/1/139 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Presenting a multi-objective mathematical model with an integrated approach to scheduling and financial flow in production projects using NSGA-II
by: Sajad Janbaz, et al.
Published: (2023-11-01) -
Optimized scheduling mechanism based on IEEE 802.1Qch standard in time-sensitive networking
by: Hongrui NIE, et al.
Published: (2022-09-01) -
Bi-level data-driven enterprise-wide optimization with mixed-integer nonlinear scheduling problems
by: Hasan Nikkhah, et al.
Published: (2025-03-01) -
MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation
by: Shiming Yang, et al.
Published: (2025-01-01) -
Challenges and Opportunities in Fog Computing Scheduling: A Literature Review
by: Wu Chia Chuan, et al.
Published: (2025-01-01)