Planning of construction supply system in constrained conditions using the dynamic programming method
Introduction. The application of the dynamic programming method is widely used to solve optimization problems in construction. Depending on the complexity of the project and the conditions during the construction of buildings and structures, making optimal decisions may require the analysis of a lar...
Saved in:
Main Authors: | Ya. D. Ageeva, Yu. A. Chirkunov, A. A. Lapidus |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2024-12-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | https://www.vestnikmgsu.ru/jour/article/view/453 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimizing the Construction Supply Chain Network Considering the Flow of Materials, Equipment, Manpower, Drawings and Technical Documents
by: Seyed Saeid Helli, et al.
Published: (2024-07-01) -
A DISCOURSE ON LEAN CONSTRUCTION IN AFRICA, USING A SUPPLY CHAIN EXAMPLE
by: Fidelise EMUZE
Published: (2017-06-01) -
Optimal Covid-19 Control on Effectiveness of Detection Campaign and Treatment
by: Mouhamadou A. M. T. Baldé, et al.
Published: (2025-04-01) -
A SOFT SYSTEMS METHODOLOGY APPROACH TO IMPROVING THE SUPPLY CHAIN OF A CONSTRUCTION PROJECT IN GAUTENG PROVINCE, SOUTH AFRICA
by: Lewis Tsuro, et al.
Published: (2020-09-01) -
Exploring Critical Factors Influencing the Resilience of the Prefabricated Construction Supply Chain
by: Tianyang Liu, et al.
Published: (2025-01-01)