Firefly Optimization Algorithm for the Prediction of Uplift due to High-Pressure Jet Grouting
A project that needs to be uplifted by high-pressure jet grouting (HPJG) is exposed to particular geological and engineering circumstances; meanwhile, HPJG has intense subjectivity, short of the theoretical base, to ascertain the influence angle β and enlarged radius Δa, which are the main parameter...
Saved in:
Main Authors: | Wukui Dai, Li Liang, Bingji Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8833784 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
On Technology and Quota for High_pressure Jet Grouting Construction
by: 杨义忠, et al.
Published: (2002-01-01) -
Probing into Some Problems about High Pressure Jet Grouting
by: 查振衡, et al.
Published: (2001-01-01) -
Application of High Pressure Jet Grouting Technique to Seepage-proof and Reinforcement in an Earth Dam
by: DAI Qiao-zhong
Published: (2009-01-01) -
Application of Vertical Pile Driven by Vibration and High Pressure Jet Grouting Technique in Reinforcement of Xiakouba Reservoir
by: 卢晓鹏
Published: (2003-01-01) -
DISCRETE VARIABLE OPTIMUM DESIGN FOR THE PRESSURE VESSEL BASED ON IMPROVED FIREFLY ALGORITHM
by: CHEN DingLiang, et al.
Published: (2017-01-01)