ETCS (ESC) and GSM-R (RSC) compatibility tests in polish conditions
Abstract: The process of verification of the installation of the ‘on-board control-command and signalling’ subsystem is complex and requires numerous and time-consuming checks of both the overall technical documentation for a given ETCS installation on a specific vehicle, as well as chec...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
SITK RP
2022-08-01
|
| Series: | Przegląd Komunikacyjny |
| Online Access: | http://www.transportation.overview.pwr.edu.pl/UPLOAD/BAZA-ARTYKULOW/ENG/2022/08/A_ENG_22_08_09_03.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|