Investigation of Special Engineering Geologic Problems of the Secondary Dam Foundation of Shuicheng Reservoir
Saved in:
Main Author: | ZHENG Dong-yan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2005-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47668663&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Seepage Treatment for Foundation of Dam of Luyinhu Reservoir
by: LIU Rui, et al.
Published: (2005-01-01) -
Engineering Geologic Problems and Treatment Measures for Intake Towers Foundation of Baise Hydropower Station
by: YU Hua-zhu
Published: (2006-01-01) -
Analysis of Main Engineering and Geological Problems in Water Delivery Tunnel of Liubu'ao Reservoir
by: HU Kaiting, et al.
Published: (2023-01-01) -
A Vibration-Isolating Blast Technique with Shock-Reflection Device for Dam Foundation Excavation in Complicated Geological Conditions
by: Haoran Hu, et al.
Published: (2018-01-01) -
Discussions on Theoretical Problems of Engineering Geologic Prospecting
by: LI Ning-xin
Published: (2005-01-01)