Including Lifetime Hydraulic Turbine Cost into Short-Term Hybrid Scheduling of Hydro and Solar
In traditional short-term hydropower scheduling problems, which usually determine the optimal power generation schedules within one week, the off-design zone of a hydraulic turbine is modeled as a forbidden zone due to the significantly increased risk of turbine damage when operating within this zon...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2024-10-01
|
| Series: | Energies |
| Subjects: | |
| Online Access: | https://www.mdpi.com/1996-1073/17/21/5246 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|