Probe into Several Problems in First Construction(in Metal)Control Network in Shihutang Navigation and Hydroelectric Project
Saved in:
| Main Authors: | HE Bao-gen, WANG Xiao-gang, WANG Jian-cheng |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2011-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47660191&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Probe into Project Management at Preliminary Design Stage of Shihutang Navigation and Electricity Water Juncture on Ganjiang River
by: HE Jian-bo
Published: (2010-01-01) -
Development of Mapping Techniques in Water Conservancy and Hydroelectricity Projects in Pearl River Basin
by: HE Bao-gen, et al.
Published: (2010-01-01) -
Design of Metal Structure in Baixianglin Hydroelectricity Project in Zhaotong City of Yunnan
by: HAN Yun-feng
Published: (2009-01-01) -
Study of the TOT Financing Mede in the Comprehensive Hydroelectricity Project
by: 黄伟杰, et al.
Published: (2007-01-01) -
Fuzzy Investment Estimation of Hydroelectricity Projects with BP Neural Network
by: LIU Zhi-hong, et al.
Published: (2009-01-01)