Configuration Synthesis and Kinematics Analysis of the 1R2T Parallel Mechanism in the Chinese Baijiu Box Packaging Production Line
A station in the Chinese Baijiu box packaging production line has a height difference between the two production lines due to the workshop layout, and the height difference will increase the defective rate of the Chinese Baijiu box base of the station. Aiming at the problem of high defective rate, a...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Journal of Mechanical Transmission
2023-06-01
|
Series: | Jixie chuandong |
Subjects: | |
Online Access: | http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2023.06.007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!