Configuration Synthesis and Kinematics Analysis of the 1R2T Parallel Mechanism in the Chinese Baijiu Box Packaging Production Line

A station in the Chinese Baijiu box packaging production line has a height difference between the two production lines due to the workshop layout, and the height difference will increase the defective rate of the Chinese Baijiu box base of the station. Aiming at the problem of high defective rate, a...

Full description

Saved in:
Bibliographic Details
Main Authors: Liu Juan, Li Ruiqin, Wang Yuan, Ning Fengping
Format: Article
Language:zho
Published: Editorial Office of Journal of Mechanical Transmission 2023-06-01
Series:Jixie chuandong
Subjects:
Online Access:http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2023.06.007
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items