BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY

Productivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot o...

Full description

Saved in:
Bibliographic Details
Main Author: ari andriyas puji
Format: Article
Language:English
Published: UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department 2022-07-01
Series:Journal of Industrial Engineering and Halal Industries
Subjects:
Online Access:https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3501
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841558802812370944
author ari andriyas puji
author_facet ari andriyas puji
author_sort ari andriyas puji
collection DOAJ
description Productivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot of loss time. As a result of the loss time, the resulting production is not in accordance with the company's target. So the purpose of this research is to measure the productivity level of a bielomatic machine by using the Overall Equipment Effectiveness (OEE) method and to minimize the Six Big Losses which are the cause of the decline in engine performance. Based on the results of the implementation of the method and discussion, the results of the calculation of the OEE value from 62.76% - 80.03%, it can be concluded that the bielomatic machine still has an OEE value below the standard 85%. From the calculation of the six big losses, several factors were found that caused the low productivity of bielomatic machines, namely the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections. This study also provides input for improvements in the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections after parsing existing problems using Fishbone diagrams.
format Article
id doaj-art-e1f1f873fc834cb6873cf7e23fa2d80e
institution Kabale University
issn 2722-8150
2722-8142
language English
publishDate 2022-07-01
publisher UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department
record_format Article
series Journal of Industrial Engineering and Halal Industries
spelling doaj-art-e1f1f873fc834cb6873cf7e23fa2d80e2025-01-06T05:54:18ZengUIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering DepartmentJournal of Industrial Engineering and Halal Industries2722-81502722-81422022-07-0131263410.14421/jiehis.35013127BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDYari andriyas puji0universitas muhammadiyah riauProductivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot of loss time. As a result of the loss time, the resulting production is not in accordance with the company's target. So the purpose of this research is to measure the productivity level of a bielomatic machine by using the Overall Equipment Effectiveness (OEE) method and to minimize the Six Big Losses which are the cause of the decline in engine performance. Based on the results of the implementation of the method and discussion, the results of the calculation of the OEE value from 62.76% - 80.03%, it can be concluded that the bielomatic machine still has an OEE value below the standard 85%. From the calculation of the six big losses, several factors were found that caused the low productivity of bielomatic machines, namely the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections. This study also provides input for improvements in the setup and adjustment, Equipment Failure, and Reduced Speed ​​sections after parsing existing problems using Fishbone diagrams.https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3501tpm, oee, six big losses, fishbone diagram
spellingShingle ari andriyas puji
BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
Journal of Industrial Engineering and Halal Industries
tpm, oee, six big losses, fishbone diagram
title BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
title_full BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
title_fullStr BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
title_full_unstemmed BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
title_short BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
title_sort bielomatic machine productivity analysis using overall equipment effectiveness oee method case study
topic tpm, oee, six big losses, fishbone diagram
url https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3501
work_keys_str_mv AT ariandriyaspuji bielomaticmachineproductivityanalysisusingoverallequipmenteffectivenessoeemethodcasestudy