BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY
Productivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot o...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department
2022-07-01
|
Series: | Journal of Industrial Engineering and Halal Industries |
Subjects: | |
Online Access: | https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3501 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841558802812370944 |
---|---|
author | ari andriyas puji |
author_facet | ari andriyas puji |
author_sort | ari andriyas puji |
collection | DOAJ |
description | Productivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot of loss time. As a result of the loss time, the resulting production is not in accordance with the company's target. So the purpose of this research is to measure the productivity level of a bielomatic machine by using the Overall Equipment Effectiveness (OEE) method and to minimize the Six Big Losses which are the cause of the decline in engine performance. Based on the results of the implementation of the method and discussion, the results of the calculation of the OEE value from 62.76% - 80.03%, it can be concluded that the bielomatic machine still has an OEE value below the standard 85%. From the calculation of the six big losses, several factors were found that caused the low productivity of bielomatic machines, namely the setup and adjustment, Equipment Failure, and Reduced Speed sections. This study also provides input for improvements in the setup and adjustment, Equipment Failure, and Reduced Speed sections after parsing existing problems using Fishbone diagrams. |
format | Article |
id | doaj-art-e1f1f873fc834cb6873cf7e23fa2d80e |
institution | Kabale University |
issn | 2722-8150 2722-8142 |
language | English |
publishDate | 2022-07-01 |
publisher | UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department |
record_format | Article |
series | Journal of Industrial Engineering and Halal Industries |
spelling | doaj-art-e1f1f873fc834cb6873cf7e23fa2d80e2025-01-06T05:54:18ZengUIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering DepartmentJournal of Industrial Engineering and Halal Industries2722-81502722-81422022-07-0131263410.14421/jiehis.35013127BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDYari andriyas puji0universitas muhammadiyah riauProductivity is an activity in producing an item or product using the most effective and efficient way possible. To increase the productivity of machines/equipment, it is necessary to apply TPM. Section CV 6 has applied the TPM method, but it doesn't work consistently so there are still a lot of loss time. As a result of the loss time, the resulting production is not in accordance with the company's target. So the purpose of this research is to measure the productivity level of a bielomatic machine by using the Overall Equipment Effectiveness (OEE) method and to minimize the Six Big Losses which are the cause of the decline in engine performance. Based on the results of the implementation of the method and discussion, the results of the calculation of the OEE value from 62.76% - 80.03%, it can be concluded that the bielomatic machine still has an OEE value below the standard 85%. From the calculation of the six big losses, several factors were found that caused the low productivity of bielomatic machines, namely the setup and adjustment, Equipment Failure, and Reduced Speed sections. This study also provides input for improvements in the setup and adjustment, Equipment Failure, and Reduced Speed sections after parsing existing problems using Fishbone diagrams.https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3501tpm, oee, six big losses, fishbone diagram |
spellingShingle | ari andriyas puji BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY Journal of Industrial Engineering and Halal Industries tpm, oee, six big losses, fishbone diagram |
title | BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY |
title_full | BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY |
title_fullStr | BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY |
title_full_unstemmed | BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY |
title_short | BIELOMATIC MACHINE PRODUCTIVITY ANALYSIS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD: CASE STUDY |
title_sort | bielomatic machine productivity analysis using overall equipment effectiveness oee method case study |
topic | tpm, oee, six big losses, fishbone diagram |
url | https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3501 |
work_keys_str_mv | AT ariandriyaspuji bielomaticmachineproductivityanalysisusingoverallequipmenteffectivenessoeemethodcasestudy |