Fatigue failure of welded connections at orthotropic bridges
Orthotropic decks were applied to the long span bridges after World War II due to several advantages, such as light weight, high strength, few deck joints, durability, rapid construction, life-cycle economy. The fatigue problem of orthotropic decks was realized twenty years ago since fatigue failure...
Saved in:
Main Authors: | Z.H. Qian, D. Abruzzese |
---|---|
Format: | Article |
Language: | English |
Published: |
Gruppo Italiano Frattura
2009-06-01
|
Series: | Fracture and Structural Integrity |
Online Access: | https://www.fracturae.com/index.php/fis/article/view/57 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Fatigue failure of welded connections at orthotropic bridges
by: Z.H. Qian, et al.
Published: (2009-06-01) -
Fatigue failure of welded connections at orthotropic bridges
by: D. Abruzzese, et al.
Published: (2009-07-01) -
Dynamic Property Analysis of Orthotropic Bridge Deck with Local Fatigue Crack
by: Zhao Li, et al.
Published: (2022-01-01) -
Experimental and Numerical Investigation of Welding Residual Stress of U-Rib Joints in Orthotropic Steel Bridge Decks
by: Zhiqiang Huang, et al.
Published: (2025-01-01) -
Fatigue reliability assessment of rib-to-deck double-sided welded joints in orthotropic steel decks considering welding residual stress
by: Fanghuai Chen, et al.
Published: (2024-12-01)