Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish Car

In order to guarantee the structural safety and reliability as well as sufficient strength and stiffness of heavy load ball screw assembly of tundish car,the contact statics analysis of the ball screw assembly is conducted by the finite element software ANSYS,and the impact of contact angle and load...

Full description

Saved in:
Bibliographic Details
Main Authors: Shi Jialian, Liu Jinghui, Wu Jin, Zhao Xu
Format: Article
Language:zho
Published: Editorial Office of Journal of Mechanical Transmission 2017-01-01
Series:Jixie chuandong
Subjects:
Online Access:http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2017.03.027
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841547526650462208
author Shi Jialian
Liu Jinghui
Wu Jin
Zhao Xu
author_facet Shi Jialian
Liu Jinghui
Wu Jin
Zhao Xu
author_sort Shi Jialian
collection DOAJ
description In order to guarantee the structural safety and reliability as well as sufficient strength and stiffness of heavy load ball screw assembly of tundish car,the contact statics analysis of the ball screw assembly is conducted by the finite element software ANSYS,and the impact of contact angle and load on the stress and deformation of ball screw assembly is explored. The results show that the maximum stress of the ball screw assembly is 1093. 7 MPa,which is smaller than the allowable stress of the structure and therefore satisfies the requirements of stiffness and strength. Moreover,the contact stress and deformation of the ball screw assembly decreases with the increasing of the contact angle and increases with the increasing of the load.
format Article
id doaj-art-d9593cfc0db849c19e9894ce03e5b807
institution Kabale University
issn 1004-2539
language zho
publishDate 2017-01-01
publisher Editorial Office of Journal of Mechanical Transmission
record_format Article
series Jixie chuandong
spelling doaj-art-d9593cfc0db849c19e9894ce03e5b8072025-01-10T14:35:50ZzhoEditorial Office of Journal of Mechanical TransmissionJixie chuandong1004-25392017-01-014113914229929323Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish CarShi JialianLiu JinghuiWu JinZhao XuIn order to guarantee the structural safety and reliability as well as sufficient strength and stiffness of heavy load ball screw assembly of tundish car,the contact statics analysis of the ball screw assembly is conducted by the finite element software ANSYS,and the impact of contact angle and load on the stress and deformation of ball screw assembly is explored. The results show that the maximum stress of the ball screw assembly is 1093. 7 MPa,which is smaller than the allowable stress of the structure and therefore satisfies the requirements of stiffness and strength. Moreover,the contact stress and deformation of the ball screw assembly decreases with the increasing of the contact angle and increases with the increasing of the load.http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2017.03.027Tundish carBall screw assemblyHeavy loadContact analysis
spellingShingle Shi Jialian
Liu Jinghui
Wu Jin
Zhao Xu
Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish Car
Jixie chuandong
Tundish car
Ball screw assembly
Heavy load
Contact analysis
title Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish Car
title_full Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish Car
title_fullStr Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish Car
title_full_unstemmed Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish Car
title_short Contact Analysis of Heavy Load Ball Screw Assembly of Continuous Casting Tundish Car
title_sort contact analysis of heavy load ball screw assembly of continuous casting tundish car
topic Tundish car
Ball screw assembly
Heavy load
Contact analysis
url http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2017.03.027
work_keys_str_mv AT shijialian contactanalysisofheavyloadballscrewassemblyofcontinuouscastingtundishcar
AT liujinghui contactanalysisofheavyloadballscrewassemblyofcontinuouscastingtundishcar
AT wujin contactanalysisofheavyloadballscrewassemblyofcontinuouscastingtundishcar
AT zhaoxu contactanalysisofheavyloadballscrewassemblyofcontinuouscastingtundishcar