Research for Global Coordinating Method of Large Equipment Scheduling in Construction Site
Much energy is dissipated when large equipment moves slowly. Generally, equipment scheduling at construction site is supposed to minimize equipment slowdown and deadhead moving. Table methods are always adopted to optimize transfer sequence, but the feasible solution is well disappointing. For the a...
Saved in:
Main Authors: | Yao Ruojun, Ma Guangwen, Jin Lianghai |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2015-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2015/127574 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An Orderly Untangling Model against Arching Effect in Emergency Evacuation Based on Equilibrium Partition of Crowd
by: Lianghai Jin, et al.
Published: (2017-01-01) -
Global Attractors for the Three-Dimensional Viscous Primitive Equations of Large-Scale Atmosphere in Log-Pressure Coordinate
by: Bo You, et al.
Published: (2013-01-01) -
Energy optimization strategy on the IoT equipment based on the scheduler
by: Wanfang ZHAO, et al.
Published: (2019-03-01) -
Resilient Schedule Coordination for a Bus Transit Corridor
by: Xiongfei Lai, et al.
Published: (2020-01-01) -
Research of the Transfer Method of Four-dimensional Coordinate to Three-dimensional Coordinate
by: Ran Xiaoyan, et al.
Published: (2016-01-01)