Review of experience in the construction of NPP using modular structures with external sheet reinforcement
Introduction. To increase the competitiveness of domestic NPP projects, it is necessary to reduce the construction time to 36 months. One of the ways to solve this problem is industrialization of the construction process, which uses prefabricated elements in the form of volumetric units with sheet s...
Saved in:
Main Authors: | D. N. Korotkikh, O. A. Kornev, V. V. Belov, A. S. Silantiev, D. E. Kapustin |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2024-10-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | https://www.vestnikmgsu.ru/jour/article/view/402 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on seismic performance of SRC frame-bent structures in CAP1400 nuclear power plants
by: Zhen-Hua Xu, et al.
Published: (2025-01-01) -
Florida Consumer Preferences for Ornamental Landscape Plants
by: Hayk Khachatryan, et al.
Published: (2016-10-01) -
Florida Consumer Preferences for Ornamental Landscape Plants
by: Hayk Khachatryan, et al.
Published: (2016-10-01) -
Effects of Single Nucleotide Polymorphism Marker Density on Haplotype Block Partition
by: Sun Ah Kim, et al.
Published: (2016-12-01) -
When People Parent Together: Let’s Talk About Coparenting
by: James McHale, et al.
Published: (2007-11-01)