Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum
[Objective]To address the issue of cutterhead damage and subsequent work stoppages caused by unidentified obstructions during the construction of Zhengzhou Metro Line 3 tunnel, it is essential to study comprehensive construction methods for shield receiving in water-rich silty sand stratum. [Method]...
Saved in:
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Urban Mass Transit Magazine Press
2024-12-01
|
Series: | Chengshi guidao jiaotong yanjiu |
Subjects: | |
Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.026.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|