Strong NP-hardness of two-machine flow-shop scheduling with periodic due dates(具有等间隔工期的2台机器流水作业调度问题的强NP难性)
we consider three two-machine flow-shop scheduling problems with periodic due dates, where each due date is assigned not to a specific job but to the processing order and the lengths of the intervals between two consecutive due dates are identical. The objectives are to minimize the maximum tardines...
Saved in:
| Main Authors: | 崔晓龙(CUI Xiaolong), 何周力(HE Zhouli), 梅嘉杰(MEI Jiajie), 万龙(WAN Long) |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Zhejiang University Press
2024-09-01
|
| Series: | Zhejiang Daxue xuebao. Lixue ban |
| Subjects: | |
| Online Access: | https://doi.org/10.3785/j.issn.1008-9497.2024.05.010 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
N.P. Gilyarov-Platonov as a Journalist and Publisher
by: O.S. Kruglikova
Published: (2016-08-01) -
Koncentracija cinka (Zn) u zemljištu šumskih ekosistema NP "Fruška gora"1
by: Dragica Stanković, et al.
Published: (2008-12-01) -
Koncentracija cinka (Zn) u zemljištu šumskih ekosistema NP "Fruška gora"1
by: Dragica Stanković, et al.
Published: (2008-12-01) -
The “real life” efficacy of dupilumab is independent of initial polyp size and concomitant steroids in CRSwNP
by: Nicholas J. Campion, et al.
Published: (2023-09-01) -
The morphophonological dimensions of Spanish gender marking: NP processing in Spanish bilinguals
by: Ana T. Pérez-Leroux, et al.
Published: (2024-12-01)