Strong NP-hardness of two-machine flow-shop scheduling with periodic due dates(具有等间隔工期的2台机器流水作业调度问题的强NP难性)

we consider three two-machine flow-shop scheduling problems with periodic due dates, where each due date is assigned not to a specific job but to the processing order and the lengths of the intervals between two consecutive due dates are identical. The objectives are to minimize the maximum tardines...