Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc Mine
In the upper reaches of the Datangxia Water Control Project,the high-pressure head formed by water storage will increase the water inflow in the Panlong lead-zinc mine to a certain extent and thus affect the safety of underground production.In order to eliminate the adverse effects brought by water...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2022-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.07.003 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841535894917480448 |
---|---|
author | TAO Wangxiong FENG Yuanyu LI Xijia ZHANG Aiheng |
author_facet | TAO Wangxiong FENG Yuanyu LI Xijia ZHANG Aiheng |
author_sort | TAO Wangxiong |
collection | DOAJ |
description | In the upper reaches of the Datangxia Water Control Project,the high-pressure head formed by water storage will increase the water inflow in the Panlong lead-zinc mine to a certain extent and thus affect the safety of underground production.In order to eliminate the adverse effects brought by water storage,two anti-seepage curtains are planned to be built on the east and west sides of the mine.In addition,to provide reasonable technical parameters for the actual grouting construction,this paper carries out the grouting test at a suitable position on the axis of the curtain.The test results show that:① The double-row grouting with 3 m row spacing and 6 m hole spacing can basically meet the anti-seepage standard of curtain design when arranged in a plum blossom shape;② cement clay slurry can be applied in dealing with special sections such as large karst caves and wide fissures in karst areas;③ in terms of the vertical heterogeneity of karst development,the bottom elevation of hanging curtain with deep holes in karst areas should enter the aquitard,with a depth of not less than 10 m.The results of the grouting test provide a reference for the design and construction of curtain grouting with large hole spacing and deep holes in karst areas. |
format | Article |
id | doaj-art-cee1616e62964f56a574bbb96ba672b6 |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2022-01-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-cee1616e62964f56a574bbb96ba672b62025-01-15T02:26:56ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352022-01-014347644355Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc MineTAO WangxiongFENG YuanyuLI XijiaZHANG AihengIn the upper reaches of the Datangxia Water Control Project,the high-pressure head formed by water storage will increase the water inflow in the Panlong lead-zinc mine to a certain extent and thus affect the safety of underground production.In order to eliminate the adverse effects brought by water storage,two anti-seepage curtains are planned to be built on the east and west sides of the mine.In addition,to provide reasonable technical parameters for the actual grouting construction,this paper carries out the grouting test at a suitable position on the axis of the curtain.The test results show that:① The double-row grouting with 3 m row spacing and 6 m hole spacing can basically meet the anti-seepage standard of curtain design when arranged in a plum blossom shape;② cement clay slurry can be applied in dealing with special sections such as large karst caves and wide fissures in karst areas;③ in terms of the vertical heterogeneity of karst development,the bottom elevation of hanging curtain with deep holes in karst areas should enter the aquitard,with a depth of not less than 10 m.The results of the grouting test provide a reference for the design and construction of curtain grouting with large hole spacing and deep holes in karst areas.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.07.003water storagewater inflow in minecurtain grouting testcement clay slurry |
spellingShingle | TAO Wangxiong FENG Yuanyu LI Xijia ZHANG Aiheng Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc Mine Renmin Zhujiang water storage water inflow in mine curtain grouting test cement clay slurry |
title | Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc Mine |
title_full | Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc Mine |
title_fullStr | Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc Mine |
title_full_unstemmed | Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc Mine |
title_short | Experimental Study on Curtain Grouting with Large Hole Spacing and Deep Holes in the Panlong Lead-Zinc Mine |
title_sort | experimental study on curtain grouting with large hole spacing and deep holes in the panlong lead zinc mine |
topic | water storage water inflow in mine curtain grouting test cement clay slurry |
url | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.07.003 |
work_keys_str_mv | AT taowangxiong experimentalstudyoncurtaingroutingwithlargeholespacinganddeepholesinthepanlongleadzincmine AT fengyuanyu experimentalstudyoncurtaingroutingwithlargeholespacinganddeepholesinthepanlongleadzincmine AT lixijia experimentalstudyoncurtaingroutingwithlargeholespacinganddeepholesinthepanlongleadzincmine AT zhangaiheng experimentalstudyoncurtaingroutingwithlargeholespacinganddeepholesinthepanlongleadzincmine |