Factors in Deciding to Speed Up Construction Work Are Schedule Cost and CO2 Emissions
This research aimed to study the life cycle assessment, critical path, and analytical hierarchy process, as well as the advantages/disadvantages of adopting the life cycle assessment and critical path methods (CPMs). The results of this study were used to develop preventative measures to decrease co...
Saved in:
Main Authors: | Wattana Surapha, Pitch Sutheerawatthana |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-01-01
|
Series: | Journal of Engineering |
Online Access: | http://dx.doi.org/10.1155/je/9954310 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
Some decidable classes of formulas of modal logic S4
by: Stanislovas Norgėla
Published: (2001-12-01)
by: Stanislovas Norgėla
Published: (2001-12-01)
Similar Items
-
THE AUTHOR'S RIGHT TO DECIDE WHETHER, HOW AND WHEN THE WORK WILL BE MADE PUBLIC
by: Ciprian Raul ROMIŢAN
Published: (2023-06-01) -
Utilizing ChatGPT4 in Deciding Follow-up Examination Intervals After Colonoscopy
by: Hyung-Hoon Oh
Published: (2024-11-01) -
On decidability of a fragment of intuitionistic predicate logic
by: Jolanta Kaušilaitė, et al.
Published: (1999-12-01) -
Some decidable classes of modal logic S5
by: Stasys Norgėla
Published: (1999-12-01) -
Fate has decidedly not treated us equally
by: Ruth MENZIES
Published: (2021-06-01)