Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number

In order to analyze the risk status and change trend of high-risk operation in hydropower projects,considering the complexity and uncertainty of the evaluation system,this paper proposes a five element connection number analysis method for risk assessment of high-risk operation in hydropower project...

Full description

Saved in:
Bibliographic Details
Main Author: ZUO Hengyi
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2021-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.06.018
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841535723643076608
author ZUO Hengyi
author_facet ZUO Hengyi
author_sort ZUO Hengyi
collection DOAJ
description In order to analyze the risk status and change trend of high-risk operation in hydropower projects,considering the complexity and uncertainty of the evaluation system,this paper proposes a five element connection number analysis method for risk assessment of high-risk operation in hydropower projects based on the five element connection number set pair analysis theory,constructs an index system,which covers four types of first-class risk indicators and 20 second-class risk indicators,including enterprise influence,safety management,construction personnel behavior and site operation according to the construction characteristics of hydropower projects,expands the connection number of set pair analysis and sets the weight of evaluation index by entropy method and order relation analysis method,establishes an identical discrepancy contrary (IDC) assessment model for high-risk operation in hydropower projects,predicts and analyzes the risk status and change trend through situation function and full & partial connection number,and assesses the risk status of high-risk operation taking a hydropower project as an example.The research shows that the high-risk operation in the hydropower project is low risk,and the system shows a negative development trend,which provide a theoretical basis for risk management and control of high-risk operation in hydropower projects.
format Article
id doaj-art-bb5db5cc7a1a4ce483c4d8fb18efc9c7
institution Kabale University
issn 1001-9235
language zho
publishDate 2021-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-bb5db5cc7a1a4ce483c4d8fb18efc9c72025-01-15T02:29:39ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352021-01-014247648721Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection NumberZUO HengyiIn order to analyze the risk status and change trend of high-risk operation in hydropower projects,considering the complexity and uncertainty of the evaluation system,this paper proposes a five element connection number analysis method for risk assessment of high-risk operation in hydropower projects based on the five element connection number set pair analysis theory,constructs an index system,which covers four types of first-class risk indicators and 20 second-class risk indicators,including enterprise influence,safety management,construction personnel behavior and site operation according to the construction characteristics of hydropower projects,expands the connection number of set pair analysis and sets the weight of evaluation index by entropy method and order relation analysis method,establishes an identical discrepancy contrary (IDC) assessment model for high-risk operation in hydropower projects,predicts and analyzes the risk status and change trend through situation function and full & partial connection number,and assesses the risk status of high-risk operation taking a hydropower project as an example.The research shows that the high-risk operation in the hydropower project is low risk,and the system shows a negative development trend,which provide a theoretical basis for risk management and control of high-risk operation in hydropower projects.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.06.018hydropower projecthigh-risk operationset pair analysismultivariate connection numberrisk assessment
spellingShingle ZUO Hengyi
Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number
Renmin Zhujiang
hydropower project
high-risk operation
set pair analysis
multivariate connection number
risk assessment
title Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number
title_full Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number
title_fullStr Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number
title_full_unstemmed Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number
title_short Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number
title_sort risk assessment on high risk operation in hydropower projects based on multivariate connection number
topic hydropower project
high-risk operation
set pair analysis
multivariate connection number
risk assessment
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.06.018
work_keys_str_mv AT zuohengyi riskassessmentonhighriskoperationinhydropowerprojectsbasedonmultivariateconnectionnumber