Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number

In order to analyze the risk status and change trend of high-risk operation in hydropower projects,considering the complexity and uncertainty of the evaluation system,this paper proposes a five element connection number analysis method for risk assessment of high-risk operation in hydropower project...

Full description

Saved in:
Bibliographic Details
Main Author: ZUO Hengyi
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2021-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.06.018
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In order to analyze the risk status and change trend of high-risk operation in hydropower projects,considering the complexity and uncertainty of the evaluation system,this paper proposes a five element connection number analysis method for risk assessment of high-risk operation in hydropower projects based on the five element connection number set pair analysis theory,constructs an index system,which covers four types of first-class risk indicators and 20 second-class risk indicators,including enterprise influence,safety management,construction personnel behavior and site operation according to the construction characteristics of hydropower projects,expands the connection number of set pair analysis and sets the weight of evaluation index by entropy method and order relation analysis method,establishes an identical discrepancy contrary (IDC) assessment model for high-risk operation in hydropower projects,predicts and analyzes the risk status and change trend through situation function and full & partial connection number,and assesses the risk status of high-risk operation taking a hydropower project as an example.The research shows that the high-risk operation in the hydropower project is low risk,and the system shows a negative development trend,which provide a theoretical basis for risk management and control of high-risk operation in hydropower projects.