APA (7th ed.) Citation

Hengyi, Z. Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number. Editorial Office of Pearl River.

Chicago Style (17th ed.) Citation

Hengyi, ZUO. Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number. Editorial Office of Pearl River.

MLA (9th ed.) Citation

Hengyi, ZUO. Risk Assessment on High-risk Operation in Hydropower Projects Based on Multivariate Connection Number. Editorial Office of Pearl River.

Warning: These citations may not always be 100% accurate.