Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
In the location-related planning of a hydropower system, the consideration of future operations under uncertainties can make the decisions sustainable and robust. Then, it is of great importance to develop an effective approach that deals with the long-term stochasticity due to the long-lasting effe...
Saved in:
Main Authors: | Changjun Wang, Shutong Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2019/1534598 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Introduction to the Development and Application of Software for Short-term Optimized Dispatch of Cascade Hydropower Stations
by: MEI Ya-dong, et al.
Published: (2000-01-01) -
Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations
by: LI Yinghai, et al.
Published: (2020-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
Optimized Design of Electric Installation Arrangement of Yangxi River Hydropower Station Cascade Ⅲ
by: 王汉明
Published: (2002-01-01) -
The Impact of Shuangjiangkou Hydropower Station on the Joint Dispatch of Power Generation and Navigation for Downstream Cascade Reservoirs
by: YANG Yi, et al.
Published: (2024-09-01)