Key Points in Checking Flood Control Impact Assessment for Construction Projects within Defined Waterway Scope
Saved in:
Main Authors: | LI Guangkuo, REN Ling |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47665435&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Sample Analysis of the Key Points in Editing the Flood Risk Assessment Report for the Construction Projects in the Waterways in the Pearl River Delta Area
by: LIU Jun-yong, et al.
Published: (2006-01-01) -
Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge
by: XIE Tianyun, et al.
Published: (2023-01-01) -
Key Points of Wind Turbine Foundation Construction and Control in Wind Power Projects
by: LUO Gan
Published: (2022-01-01) -
Integrated Influence of Existing Projects on Backwater in Liuzhou City Section of Liujiang Waterway
by: HUANG Sheng-wei, et al.
Published: (2011-01-01) -
Monitoring and Evaluation of 2015 Devrek Zonguldak Landslide within the scope of Flood Risk Assessment by Landsat-8 Satellite Data
by: Şerife Pınar Güvel, et al.
Published: (2023-01-01)