Fixed start method for repetitive project scheduling with simulated annealing
This research deals with the high project completion variability by presenting a new method to decrease such variability in repetitive construction projects. To achieve this, a Fixed Start Method (FSM) —where the starts of each activity with a high level of probabilistic confidence for the planned p...
Saved in:
Main Authors: | Francisco Moreno, Eric Forcael, Francisco Orozco, Felipe Baesler, Duzgun Agdas |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2025-01-01
|
Series: | Heliyon |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2405844025001215 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Simulated annealing on uncorrelated energy landscapes
by: Ben Goertzel, et al.
Published: (1994-01-01) -
Stepped annealing chaotic neural network model for the channel assignment problem
by: ZHU Xiao-jin, et al.
Published: (2008-01-01) -
OPTIMIZATION OF SINGLY REINFORCED BEAM DESIGN USING SIMULATED ANNEALING
by: SIMON OLAYIWOLA ADEREMI OLAWALE, et al.
Published: (2021-10-01) -
OPTIMIZATION OF DOUBLY REINFORCED BEAM DESIGN USING SIMULATED ANNEALING
by: SIMON OLAYIWOLA ADEREMI OLAWALE, et al.
Published: (2020-07-01) -
Hybrid genetic simulated annealing algorithm based on niching for QoS multicast routing
by: FAN Yi-ming1, et al.
Published: (2008-01-01)