Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study)
PT XYZ is a company engaged in the pipe industry with various types of HDPE pipe products according to consumer needs. PT XYZ has problems with the BX-75 engine because it has a high breakdown value and is obtained from historical production data. The high breakdown caused the production process of...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department
2023-08-01
|
Series: | Journal of Industrial Engineering and Halal Industries |
Subjects: | |
Online Access: | https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/4046 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841558785422786560 |
---|---|
author | Indro Prakoso Denny Andiya Nur Wibowo |
author_facet | Indro Prakoso Denny Andiya Nur Wibowo |
author_sort | Indro Prakoso |
collection | DOAJ |
description | PT XYZ is a company engaged in the pipe industry with various types of HDPE pipe products according to consumer needs. PT XYZ has problems with the BX-75 engine because it has a high breakdown value and is obtained from historical production data. The high breakdown caused the production process of the BX-75 engine to be hampered and the daily production target was reduced. To determine the effectiveness of the BX-75 engine, measurements using the Overall Equipment Effectiveness (OEE) method are needed. The research was conducted using the OEE method to identify whether it is in accordance with world class standards, if the OEE value is still low, a Six Big Losses analysis will be carried out from the pareto chart which will determine what losses affect the low OEE value and analyze the details of the causes of each fishbone diagram. The average OEE value on BX-75 machines in November-December 2022 was 78.86%. The result is still below 85% so six big losses analysis is still needed. There are two types of losses that dominate, namely downtime losses and setup & adjustment losses. Downtime losses have an average loss of 13.50% and setup losses have an average of 9.53%. |
format | Article |
id | doaj-art-9f140b384cb24e99bcbb5cbcd52f62f4 |
institution | Kabale University |
issn | 2722-8150 2722-8142 |
language | English |
publishDate | 2023-08-01 |
publisher | UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department |
record_format | Article |
series | Journal of Industrial Engineering and Halal Industries |
spelling | doaj-art-9f140b384cb24e99bcbb5cbcd52f62f42025-01-06T05:54:18ZengUIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering DepartmentJournal of Industrial Engineering and Halal Industries2722-81502722-81422023-08-014110.14421/jiehis.40463672Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study)Indro Prakoso0Denny Andiya Nur Wibowo1Universitas Jenderal SoedirmanUniversitas Jenderal SoedirmanPT XYZ is a company engaged in the pipe industry with various types of HDPE pipe products according to consumer needs. PT XYZ has problems with the BX-75 engine because it has a high breakdown value and is obtained from historical production data. The high breakdown caused the production process of the BX-75 engine to be hampered and the daily production target was reduced. To determine the effectiveness of the BX-75 engine, measurements using the Overall Equipment Effectiveness (OEE) method are needed. The research was conducted using the OEE method to identify whether it is in accordance with world class standards, if the OEE value is still low, a Six Big Losses analysis will be carried out from the pareto chart which will determine what losses affect the low OEE value and analyze the details of the causes of each fishbone diagram. The average OEE value on BX-75 machines in November-December 2022 was 78.86%. The result is still below 85% so six big losses analysis is still needed. There are two types of losses that dominate, namely downtime losses and setup & adjustment losses. Downtime losses have an average loss of 13.50% and setup losses have an average of 9.53%.https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/4046machine effectiveness measurementfishbone diagramsix big lossesmachine effectiveness measurement, manufacturoverall equipment effectiveness |
spellingShingle | Indro Prakoso Denny Andiya Nur Wibowo Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study) Journal of Industrial Engineering and Halal Industries machine effectiveness measurement fishbone diagram six big losses machine effectiveness measurement, manufacturoverall equipment effectiveness |
title | Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study) |
title_full | Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study) |
title_fullStr | Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study) |
title_full_unstemmed | Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study) |
title_short | Measurement of Machine Effectiveness Using the Overall Equipment Effectiveness (OEE) Value Approach on the BX-75 Machine (A Case Study) |
title_sort | measurement of machine effectiveness using the overall equipment effectiveness oee value approach on the bx 75 machine a case study |
topic | machine effectiveness measurement fishbone diagram six big losses machine effectiveness measurement, manufacturoverall equipment effectiveness |
url | https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/4046 |
work_keys_str_mv | AT indroprakoso measurementofmachineeffectivenessusingtheoverallequipmenteffectivenessoeevalueapproachonthebx75machineacasestudy AT dennyandiyanurwibowo measurementofmachineeffectivenessusingtheoverallequipmenteffectivenessoeevalueapproachonthebx75machineacasestudy |