Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project

The second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longit...

Full description

Saved in:
Bibliographic Details
Main Authors: CHEN Guihua, LI Guangyi, SU Wenliang
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2023-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841536114831130624
author CHEN Guihua
LI Guangyi
SU Wenliang
author_facet CHEN Guihua
LI Guangyi
SU Wenliang
author_sort CHEN Guihua
collection DOAJ
description The second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longitudinal cofferdams by a 1∶80 overall model test,which is combined with factors such as relevant hydraulic conditions,energy dissipation and erosion prevention,investment,and construction period.After optimization,the right bank side of the upstream transverse cofferdam is demolished to the elevation of 31.17 m and the sluice gate section is the elevation of 25 m.The demolition length of the upstream section of the longitudinal cofferdam is 275 m,and it is demolished to the elevation of 36 m with the remaining 50 m not being demolished.The downstream horizontal earth-rock cofferdam is completely demolished,and the longitudinal cofferdam is demolished to the elevation of 30 m,with a demolition length of 202 m.The optimized demolition scheme meets the designed hydraulic conditions,reduces the construction difficulty,and decreases the demolition quantities and investment.
format Article
id doaj-art-981dc315ff744f1095abe1937fd1f297
institution Kabale University
issn 1001-9235
language zho
publishDate 2023-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-981dc315ff744f1095abe1937fd1f2972025-01-15T02:22:41ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352023-01-014447639684Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy ProjectCHEN GuihuaLI GuangyiSU WenliangThe second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longitudinal cofferdams by a 1∶80 overall model test,which is combined with factors such as relevant hydraulic conditions,energy dissipation and erosion prevention,investment,and construction period.After optimization,the right bank side of the upstream transverse cofferdam is demolished to the elevation of 31.17 m and the sluice gate section is the elevation of 25 m.The demolition length of the upstream section of the longitudinal cofferdam is 275 m,and it is demolished to the elevation of 36 m with the remaining 50 m not being demolished.The downstream horizontal earth-rock cofferdam is completely demolished,and the longitudinal cofferdam is demolished to the elevation of 30 m,with a demolition length of 202 m.The optimized demolition scheme meets the designed hydraulic conditions,reduces the construction difficulty,and decreases the demolition quantities and investment.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006model testdemolition optimizationsecond-phase cofferdam of Datengxia Water Conservancy Project
spellingShingle CHEN Guihua
LI Guangyi
SU Wenliang
Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
Renmin Zhujiang
model test
demolition optimization
second-phase cofferdam of Datengxia Water Conservancy Project
title Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
title_full Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
title_fullStr Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
title_full_unstemmed Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
title_short Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
title_sort optimization design of the second phase cofferdam demolition of datengxia water conservancy project
topic model test
demolition optimization
second-phase cofferdam of Datengxia Water Conservancy Project
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006
work_keys_str_mv AT chenguihua optimizationdesignofthesecondphasecofferdamdemolitionofdatengxiawaterconservancyproject
AT liguangyi optimizationdesignofthesecondphasecofferdamdemolitionofdatengxiawaterconservancyproject
AT suwenliang optimizationdesignofthesecondphasecofferdamdemolitionofdatengxiawaterconservancyproject