Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
The second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longit...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2023-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841536114831130624 |
---|---|
author | CHEN Guihua LI Guangyi SU Wenliang |
author_facet | CHEN Guihua LI Guangyi SU Wenliang |
author_sort | CHEN Guihua |
collection | DOAJ |
description | The second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longitudinal cofferdams by a 1∶80 overall model test,which is combined with factors such as relevant hydraulic conditions,energy dissipation and erosion prevention,investment,and construction period.After optimization,the right bank side of the upstream transverse cofferdam is demolished to the elevation of 31.17 m and the sluice gate section is the elevation of 25 m.The demolition length of the upstream section of the longitudinal cofferdam is 275 m,and it is demolished to the elevation of 36 m with the remaining 50 m not being demolished.The downstream horizontal earth-rock cofferdam is completely demolished,and the longitudinal cofferdam is demolished to the elevation of 30 m,with a demolition length of 202 m.The optimized demolition scheme meets the designed hydraulic conditions,reduces the construction difficulty,and decreases the demolition quantities and investment. |
format | Article |
id | doaj-art-981dc315ff744f1095abe1937fd1f297 |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2023-01-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-981dc315ff744f1095abe1937fd1f2972025-01-15T02:22:41ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352023-01-014447639684Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy ProjectCHEN GuihuaLI GuangyiSU WenliangThe second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longitudinal cofferdams by a 1∶80 overall model test,which is combined with factors such as relevant hydraulic conditions,energy dissipation and erosion prevention,investment,and construction period.After optimization,the right bank side of the upstream transverse cofferdam is demolished to the elevation of 31.17 m and the sluice gate section is the elevation of 25 m.The demolition length of the upstream section of the longitudinal cofferdam is 275 m,and it is demolished to the elevation of 36 m with the remaining 50 m not being demolished.The downstream horizontal earth-rock cofferdam is completely demolished,and the longitudinal cofferdam is demolished to the elevation of 30 m,with a demolition length of 202 m.The optimized demolition scheme meets the designed hydraulic conditions,reduces the construction difficulty,and decreases the demolition quantities and investment.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006model testdemolition optimizationsecond-phase cofferdam of Datengxia Water Conservancy Project |
spellingShingle | CHEN Guihua LI Guangyi SU Wenliang Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project Renmin Zhujiang model test demolition optimization second-phase cofferdam of Datengxia Water Conservancy Project |
title | Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project |
title_full | Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project |
title_fullStr | Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project |
title_full_unstemmed | Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project |
title_short | Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project |
title_sort | optimization design of the second phase cofferdam demolition of datengxia water conservancy project |
topic | model test demolition optimization second-phase cofferdam of Datengxia Water Conservancy Project |
url | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006 |
work_keys_str_mv | AT chenguihua optimizationdesignofthesecondphasecofferdamdemolitionofdatengxiawaterconservancyproject AT liguangyi optimizationdesignofthesecondphasecofferdamdemolitionofdatengxiawaterconservancyproject AT suwenliang optimizationdesignofthesecondphasecofferdamdemolitionofdatengxiawaterconservancyproject |