Optimising load transfer using temporary supports in monolithic construction

When constructing a ceiling slab, it is essential that the load is effectively transferred to the lower floors. However, challenges arise when the lower ceiling slabs do not meet the specified design strengths, potentially indicating inadequate load bearing capacity. This article explores a novel a...

Full description

Saved in:
Bibliographic Details
Main Authors: Milan Švolík, Peter Makýš, Patrik Šťastný, Marek Ďubek
Format: Article
Language:English
Published: CTU Central Library 2024-11-01
Series:Acta Polytechnica
Subjects:
Online Access:https://ojs.cvut.cz/ojs/index.php/ap/article/view/9695
Tags: Add Tag
No Tags, Be the first to tag this record!