Proactive Production Scheduling Approach for Off-Site Construction with Due Date Uncertainty
This study proposes a robust precast concrete (PC) production scheduling model for PC construction projects with schedule uncertainty by adopting a proactive scheduling approach. The proposed model consists of a PC production simulation module that simulates and evaluates the total tardiness of the...
Saved in:
| Main Authors: | Taehoon Kim, Yong-Woo Kim |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2024-11-01
|
| Series: | Applied Sciences |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-3417/14/23/11017 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Embodied carbon of BIM bridge models according to the application of off-site prefabrication: Precast concrete applied to superstructure and substructure
by: Hyunsik Kim, et al.
Published: (2024-12-01) -
Geometric and harmonic means based priority dispatching rules for single machine scheduling problems
by: Shafi Ahmad, et al.
Published: (2021-07-01) -
Improving resilience of networked multi-energy carrier microgrids through proactive scheduling
by: Ali Akbar Ghasemi, et al.
Published: (2025-04-01) -
Strong NP-hardness of two-machine flow-shop scheduling with periodic due dates(具有等间隔工期的2台机器流水作业调度问题的强NP难性)
by: 崔晓龙(CUI Xiaolong), et al.
Published: (2024-09-01) -
Hybrid genetic algorithm to minimize scheduling cost with unequal and job dependent earliness tardiness cost
by: Prasad Bari, et al.
Published: (2023-11-01)