Application of the Digital Parallel Survey Procedure to the Measurement in the Emergent Water Supply Project
Saved in:
Main Author: | GUO Wan-li |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47665026&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Summary of the Archive Management in the Pearl River Emergent Water Deployment Project for Salty Water Resistance and Fresh Water Supply in 2005
by: GUO Yan-ling
Published: (2007-01-01) -
Application of Controlled Blasting Technology in the Modification Project for Dongshen Water Supply
by: 张力文, et al.
Published: (2004-01-01) -
Application of Reinforced Concrete Support to Deep Foundation Digging for Xixi Powerhouse in Chaozhou Water Supply Project
by: ZHAO Guo-qing
Published: (2008-01-01) -
Application of Conduit Jacking Technique in Shiyan--Songguang Water Supply Network Project
by: 张敏, et al.
Published: (2003-01-01) -
Feature Analysis of Water Resources Appraisal for Municipal Water Supply Project
by: HE Jing-liang, et al.
Published: (2005-01-01)