Technical Problems of Tunneling of Water Diversion Project in East Shenzhen
Saved in:
Main Author: | 田安建 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2001-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672660&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction of Tunnelling in Tender Section Ⅲ of East Shenzhen Water Supply Source Project
by: 肖华, et al.
Published: (2002-01-01) -
On Selection of Pipe Shape and Determination of Calibre for the North Line of Shenzhen Water Diversion Project
by: 柳立平, et al.
Published: (2004-01-01) -
Construction of Horseshoe Tunnel with Small Section for Shenzhen Eastern Water Supply Project
by: WANG Zhao-li, et al.
Published: (2001-01-01) -
Construction Technique of Tunnel Transiting Faulted Rupture Zone in Water Supply Project in the Eastern Shenzhen City
by: WANG Xiao-xing
Published: (2006-01-01) -
Prove into the Shape Selection of Water Delivery through Underground Pressure in Dongjiang-Shenzhen Water Supply Project.
by: 黄建添
Published: (2001-01-01)