Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule
Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant, taking into account the load schedule, is an analytical process to establish the shortest required period during which profiled assemblies used in the nuclear power plant energy process must rem...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Национальный исследовательский ядерный университет МИФИ
2024-04-01
|
| Series: | Глобальная ядерная безопасность |
| Subjects: | |
| Online Access: | https://glonucsec.elpub.ru/jour/article/view/236 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1846163208337883136 |
|---|---|
| author | M. A. Hakobyan A. I. Ksenofontov S. A. Sargsyan S. B. Umarov |
| author_facet | M. A. Hakobyan A. I. Ksenofontov S. A. Sargsyan S. B. Umarov |
| author_sort | M. A. Hakobyan |
| collection | DOAJ |
| description | Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant, taking into account the load schedule, is an analytical process to establish the shortest required period during which profiled assemblies used in the nuclear power plant energy process must remain in active use. This process considers factors related to changes in the electrical load on the station during different periods. Within the scope of this definition, an analysis of the technical characteristics of profiled assemblies is conducted as well as their impact on the overall performance of the nuclear power plant. Key considerations in the cooling time include operational safety, compliance with regulatory requirements, and efficient distribution of energy resources in accordance with the load schedule. The goal of this process is to ensure optimal and safe operation of profiled assemblies, adapted to changes in the electrical grid and aligned with the load schedule, thereby contributing to the more efficient functioning of the nuclear power plant. This study aims to substantiate the minimum required cooling time for profiled nuclear assemblies characterized by an average uranium enrichment of 3.82% and an average burnup of 45.7 Megawatt-days per kilogram of uranium (MWD/kgU). Calculations are performed using the ORIGEN-ARP program, part of the SCALE software package designed for the analysis and modeling of radioactive and nuclear processes. The study considers parameters such as the composition of nuclear assemblies, fuel burnup, modeling using the ORIGEN-ARP program, and safety analysis. The results obtained aim to make a significant contribution to enhancing the efficiency and safety of nuclear energy installations |
| format | Article |
| id | doaj-art-858b1d48d0cc42b0ae2e17af87c355ec |
| institution | Kabale University |
| issn | 2305-414X 2499-9733 |
| language | English |
| publishDate | 2024-04-01 |
| publisher | Национальный исследовательский ядерный университет МИФИ |
| record_format | Article |
| series | Глобальная ядерная безопасность |
| spelling | doaj-art-858b1d48d0cc42b0ae2e17af87c355ec2024-11-19T13:46:56ZengНациональный исследовательский ядерный университет МИФИГлобальная ядерная безопасность2305-414X2499-97332024-04-01019310010.26583/gns-2024-01-12190Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load scheduleM. A. Hakobyan0A. I. Ksenofontov1S. A. Sargsyan2S. B. Umarov3Армянская атомная электростанция; Национальный исследовательский ядерный университет «МИФИ»Национальный исследовательский ядерный университет «МИФИ»Армянская атомная электростанцияТашкентский филиал Национального исследовательского ядерного университетаDetermining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant, taking into account the load schedule, is an analytical process to establish the shortest required period during which profiled assemblies used in the nuclear power plant energy process must remain in active use. This process considers factors related to changes in the electrical load on the station during different periods. Within the scope of this definition, an analysis of the technical characteristics of profiled assemblies is conducted as well as their impact on the overall performance of the nuclear power plant. Key considerations in the cooling time include operational safety, compliance with regulatory requirements, and efficient distribution of energy resources in accordance with the load schedule. The goal of this process is to ensure optimal and safe operation of profiled assemblies, adapted to changes in the electrical grid and aligned with the load schedule, thereby contributing to the more efficient functioning of the nuclear power plant. This study aims to substantiate the minimum required cooling time for profiled nuclear assemblies characterized by an average uranium enrichment of 3.82% and an average burnup of 45.7 Megawatt-days per kilogram of uranium (MWD/kgU). Calculations are performed using the ORIGEN-ARP program, part of the SCALE software package designed for the analysis and modeling of radioactive and nuclear processes. The study considers parameters such as the composition of nuclear assemblies, fuel burnup, modeling using the ORIGEN-ARP program, and safety analysis. The results obtained aim to make a significant contribution to enhancing the efficiency and safety of nuclear energy installationshttps://glonucsec.elpub.ru/jour/article/view/236аэсатомная энергетикарадиационная безопасностьрасчет остаточного энерговыделенияпрограмма origen |
| spellingShingle | M. A. Hakobyan A. I. Ksenofontov S. A. Sargsyan S. B. Umarov Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule Глобальная ядерная безопасность аэс атомная энергетика радиационная безопасность расчет остаточного энерговыделения программа origen |
| title | Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule |
| title_full | Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule |
| title_fullStr | Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule |
| title_full_unstemmed | Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule |
| title_short | Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule |
| title_sort | determining the minimum required cooling time of profiled assemblies at the armenian nuclear power plant taking into account the load schedule |
| topic | аэс атомная энергетика радиационная безопасность расчет остаточного энерговыделения программа origen |
| url | https://glonucsec.elpub.ru/jour/article/view/236 |
| work_keys_str_mv | AT mahakobyan determiningtheminimumrequiredcoolingtimeofprofiledassembliesatthearmeniannuclearpowerplanttakingintoaccounttheloadschedule AT aiksenofontov determiningtheminimumrequiredcoolingtimeofprofiledassembliesatthearmeniannuclearpowerplanttakingintoaccounttheloadschedule AT sasargsyan determiningtheminimumrequiredcoolingtimeofprofiledassembliesatthearmeniannuclearpowerplanttakingintoaccounttheloadschedule AT sbumarov determiningtheminimumrequiredcoolingtimeofprofiledassembliesatthearmeniannuclearpowerplanttakingintoaccounttheloadschedule |