Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant taking into account the load schedule
Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant, taking into account the load schedule, is an analytical process to establish the shortest required period during which profiled assemblies used in the nuclear power plant energy process must rem...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Национальный исследовательский ядерный университет МИФИ
2024-04-01
|
Series: | Глобальная ядерная безопасность |
Subjects: | |
Online Access: | https://glonucsec.elpub.ru/jour/article/view/236 |
Tags: |
Add Tag