Optimization of πT Hybrid Structure of 110 kV Power Grid

There are some operational problems of the πT hybrid structure, such as large workload of operation and maintenance, poor flexibility and scalability, which can not meet the increasing demand for power supply reliability. In this paper, the optimization scheme of the πT hybrid structure connection s...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhiyong SHI, Guomin WANG, Qi GENG, Yuan ZHANG, Tianhua WANG
Format: Article
Language:English
Published: Editorial Department of Power Generation Technology 2020-08-01
Series:发电技术
Subjects:
Online Access:https://www.pgtjournal.com/EN/10.12096/j.2096-4528.pgt.18070
Tags: Add Tag
No Tags, Be the first to tag this record!