Wind Load Analysis on Temporary Scaffolding Structures in High-Altitude Venues Based on Numerical Simulation: A Case Study From the 2022 Beijing Olympics
Scaffolding is widely used in construction, maintenance, and other activities as a temporary support structure. However, strong winds frequently cause scaffolding structures to collapse. Thus, the influence of wind load on the performance of such temporary support systems cannot be ignored. During t...
Saved in:
Main Authors: | Ming-hong Sun, Lei Zhang, Xu-yang Li, Xiao-guang Li, Qing-wen Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2024/3746675 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Athletes’ Personal Branding on Social Media: A Case Study of Eileen Gu during the Beijing Olympics
by: Fang Xie, et al.
Published: (2024-03-01) -
Study of Wind Loads and Wind Speed Amplifications on High-Rise Building with Opening by Numerical Simulation and Wind Tunnel Test
by: Fu-Bin Chen, et al.
Published: (2020-01-01) -
Assessment of Reductions in Emission-driven Air Pollution during the Beijing Olympic Games, Shanghai World Expo, Guangzhou Asian Games and Wuhan COVID-19 Lockdown
by: Ying Li, et al.
Published: (2021-05-01) -
Olympic territorialization
by: Egidio Dansero, et al.
Published: (2007-09-01) -
The strategy of venue creation: Explaining health policy change in Greece
by: Maria Mavrikou, et al.
Published: (2022-12-01)