LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODS

Tight competition in the food industry especially bread does not shrink the sales of bread produced by CV. Anni Bakery, but there are some problems that arise at this time, the limited production floor which is increasingly narrow due to increased production without adjusting existing capacity and t...

Full description

Saved in:
Bibliographic Details
Main Author: Cipto Ramdhani Yusuf
Format: Article
Language:English
Published: UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department 2020-06-01
Series:Journal of Industrial Engineering and Halal Industries
Online Access:https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/1805
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841558775851384832
author Cipto Ramdhani Yusuf
author_facet Cipto Ramdhani Yusuf
author_sort Cipto Ramdhani Yusuf
collection DOAJ
description Tight competition in the food industry especially bread does not shrink the sales of bread produced by CV. Anni Bakery, but there are some problems that arise at this time, the limited production floor which is increasingly narrow due to increased production without adjusting existing capacity and the irregular placement of production floor facilities. The background is used as a reference for the company to create a new factory. The purpose of this study is to propose the layout of production floor facilities with the right facility layout so that the cost of transferring materials is small. The systematic layout planning (SLP) approach was used. The result performance of the 1st proposal layout obtained material handling distance of 405 meters while in the 2nd proposal layout the material handling distance becomes 386 meters. The cost of moving the proposed material to 1 obtained a total cost of 22,644,300 rupiah per month, while in the second material transfer fee the total cost of 21,993,825 rupiah per month. Based on the alternative initial layout and the proposed layout, the most suitable layout is the second proposal layout.. So this facility layout plan is feasible for new factory to create.
format Article
id doaj-art-79ad5f9edde049118372795b1a3ba02f
institution Kabale University
issn 2722-8150
2722-8142
language English
publishDate 2020-06-01
publisher UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department
record_format Article
series Journal of Industrial Engineering and Halal Industries
spelling doaj-art-79ad5f9edde049118372795b1a3ba02f2025-01-06T05:57:54ZengUIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering DepartmentJournal of Industrial Engineering and Halal Industries2722-81502722-81422020-06-0111626910.14421/jiehis.1805671LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODSCipto Ramdhani Yusuf0Telkom UniversityTight competition in the food industry especially bread does not shrink the sales of bread produced by CV. Anni Bakery, but there are some problems that arise at this time, the limited production floor which is increasingly narrow due to increased production without adjusting existing capacity and the irregular placement of production floor facilities. The background is used as a reference for the company to create a new factory. The purpose of this study is to propose the layout of production floor facilities with the right facility layout so that the cost of transferring materials is small. The systematic layout planning (SLP) approach was used. The result performance of the 1st proposal layout obtained material handling distance of 405 meters while in the 2nd proposal layout the material handling distance becomes 386 meters. The cost of moving the proposed material to 1 obtained a total cost of 22,644,300 rupiah per month, while in the second material transfer fee the total cost of 21,993,825 rupiah per month. Based on the alternative initial layout and the proposed layout, the most suitable layout is the second proposal layout.. So this facility layout plan is feasible for new factory to create.https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/1805
spellingShingle Cipto Ramdhani Yusuf
LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODS
Journal of Industrial Engineering and Halal Industries
title LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODS
title_full LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODS
title_fullStr LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODS
title_full_unstemmed LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODS
title_short LAYOUT PLANNING FLOOR PRODUCTION BREAD FACTORY USING SYSTEMATIC LAYOUT PLANNING METHODS
title_sort layout planning floor production bread factory using systematic layout planning methods
url https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/1805
work_keys_str_mv AT ciptoramdhaniyusuf layoutplanningfloorproductionbreadfactoryusingsystematiclayoutplanningmethods