Analysis of Energy Absorption Device Operation in Changsha Metro Line 1

According to the performance and configuration of the regenerated energy absorption device for Changsha metro line 1, 8 different patterns of devices were set up and tested. By comparing the experimental data, the energy-saving situation of each operation mode was obtained. At the same time, the rea...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhangshuo PENG, Bin YANG, Yong CHEN, Wei WAN
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2019-09-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2019.05.027
Tags: Add Tag
No Tags, Be the first to tag this record!