Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance Tunnel

Embankment filling will have adverse effects on the structure of the overlying water conveyance tunnel.In order to reduce the impact of embankment filling on the overlying water conveyance tunnel,a load reduction plan was proposed by setting cast-in-place piles on both sides of the tunnel.Finite ele...

Full description

Saved in:
Bibliographic Details
Main Authors: LYU Li, SUN Bo, TAN Cai
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2023-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.12.011
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841535140267819008
author LYU Li
SUN Bo
TAN Cai
author_facet LYU Li
SUN Bo
TAN Cai
author_sort LYU Li
collection DOAJ
description Embankment filling will have adverse effects on the structure of the overlying water conveyance tunnel.In order to reduce the impact of embankment filling on the overlying water conveyance tunnel,a load reduction plan was proposed by setting cast-in-place piles on both sides of the tunnel.Finite element analysis was used to simulate the water conveyance tunnel without load reduction of cast-in-place piles and that with load reduction and reinforcement of cast-in-place piles under different pile spacing,pile elastic modulus,and pile row numbers.At typical section facility monitoring points,the top arch and arch waist of the tunnel lining were monitored.The stress and deformation of the connection points between the side wall,bottom plate,and side wall and bottom plate were analyzed,and the sensitivity of pile spacing,pile elastic modulus,and pile row number to the tunnel load reduction effect was analyzed.The results indicate that:① Embankment filling will cause a vertical deformation of 5.45 cm in the top arch of the tunnel lining,and the tensile stress on the concrete at the junction of the side wall and floor will reach 8.34 MPa,exceeding the allowable value of the structural tensile strength.The lining is in an unsafe state.② By setting cast-in-place piles,the adverse effects of embankment filling on the water conveyance tunnel can be effectively reduced,and the safety of the water conveyance tunnel can be improved.③ The load reduction effect of the water conveyance tunnel is significantly correlated with the pile spacing and pile row numbers,while the correlation with the elastic modulus is relatively small.
format Article
id doaj-art-688408ad2df3493e978c27dede600de6
institution Kabale University
issn 1001-9235
language zho
publishDate 2023-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-688408ad2df3493e978c27dede600de62025-01-15T02:34:46ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352023-01-014448613178Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance TunnelLYU LiSUN BoTAN CaiEmbankment filling will have adverse effects on the structure of the overlying water conveyance tunnel.In order to reduce the impact of embankment filling on the overlying water conveyance tunnel,a load reduction plan was proposed by setting cast-in-place piles on both sides of the tunnel.Finite element analysis was used to simulate the water conveyance tunnel without load reduction of cast-in-place piles and that with load reduction and reinforcement of cast-in-place piles under different pile spacing,pile elastic modulus,and pile row numbers.At typical section facility monitoring points,the top arch and arch waist of the tunnel lining were monitored.The stress and deformation of the connection points between the side wall,bottom plate,and side wall and bottom plate were analyzed,and the sensitivity of pile spacing,pile elastic modulus,and pile row number to the tunnel load reduction effect was analyzed.The results indicate that:① Embankment filling will cause a vertical deformation of 5.45 cm in the top arch of the tunnel lining,and the tensile stress on the concrete at the junction of the side wall and floor will reach 8.34 MPa,exceeding the allowable value of the structural tensile strength.The lining is in an unsafe state.② By setting cast-in-place piles,the adverse effects of embankment filling on the water conveyance tunnel can be effectively reduced,and the safety of the water conveyance tunnel can be improved.③ The load reduction effect of the water conveyance tunnel is significantly correlated with the pile spacing and pile row numbers,while the correlation with the elastic modulus is relatively small.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.12.011tunnelstressdeformationfillingload reductioncast-in-place pile
spellingShingle LYU Li
SUN Bo
TAN Cai
Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance Tunnel
Renmin Zhujiang
tunnel
stress
deformation
filling
load reduction
cast-in-place pile
title Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance Tunnel
title_full Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance Tunnel
title_fullStr Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance Tunnel
title_full_unstemmed Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance Tunnel
title_short Influence Analysis and Load Reduction Design of Embankment Filling on Overlying Water Conveyance Tunnel
title_sort influence analysis and load reduction design of embankment filling on overlying water conveyance tunnel
topic tunnel
stress
deformation
filling
load reduction
cast-in-place pile
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.12.011
work_keys_str_mv AT lyuli influenceanalysisandloadreductiondesignofembankmentfillingonoverlyingwaterconveyancetunnel
AT sunbo influenceanalysisandloadreductiondesignofembankmentfillingonoverlyingwaterconveyancetunnel
AT tancai influenceanalysisandloadreductiondesignofembankmentfillingonoverlyingwaterconveyancetunnel