Simulation-Based Model for Optimizing Highways Resurfacing Operations
Work zone length in the highways’ resurfacing is an important factor that should be determined before the start of work. This factor influences the time and cost of the project. This paper presents a framework that is dedicated for determining the optimum length of highway resurfacing work zone. The...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Riga Technical University Press
2014-03-01
|
Series: | The Baltic Journal of Road and Bridge Engineering |
Subjects: | |
Online Access: | https://bjrbe-journals.rtu.lv/article/view/3480 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|