Retracted: Optimisation of Working Line Length during the Period of Gently Inclined Slope in Tilted Coal Seam Open-Pit Mine
Saved in:
Main Author: | International Transactions on Electrical Energy Systems |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2023-01-01
|
Series: | International Transactions on Electrical Energy Systems |
Online Access: | http://dx.doi.org/10.1155/2023/9851978 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Field and Numerical Investigation on the Coal Pillar Instability of Gob-Side Entry in Gently Inclined Coal Seam
by: Xupeng Ta, et al.
Published: (2021-01-01) -
Risk assessment of gently inclined mudstone bedding slope incorporating monitoring information
by: Mingzhou Bai, et al.
Published: (2025-12-01) -
Retracted: Reconstruction and Utilization of Energy Economy Information Resources against Humanistic Background
by: International Transactions on Electrical Energy Systems
Published: (2023-01-01) -
Retracted: Wireless Mobile Power Communication System Based on Artificial Intelligence Algorithm
by: International Transactions on Electrical Energy Systems
Published: (2023-01-01) -
Retracted: Modeling and Optimization of Ship Waste Heat Utilization System Based on Genetic Algorithm and Sensing
by: International Transactions on Electrical Energy Systems
Published: (2023-01-01)