Flow scheduling technology based on BGP extended protocol

A novel centralized flow scheduling scheme based on software defined networking(SDN)was proposed.The existing problems of current flow scheduling method based on BGP were analyzed,and a new scheme was proposed.In the scheme,the BGP Flowspec was enhanced to avoid reconfiguring the related routers one...

Full description

Saved in:
Bibliographic Details
Main Authors: Yujia LUO, Liang OU, Zhiwei MO, Hong TANG
Format: Article
Language:zho
Published: Beijing Xintong Media Co., Ltd 2016-03-01
Series:Dianxin kexue
Subjects:
Online Access:http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2016113/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841529092196794368
author Yujia LUO
Liang OU
Zhiwei MO
Hong TANG
author_facet Yujia LUO
Liang OU
Zhiwei MO
Hong TANG
author_sort Yujia LUO
collection DOAJ
description A novel centralized flow scheduling scheme based on software defined networking(SDN)was proposed.The existing problems of current flow scheduling method based on BGP were analyzed,and a new scheme was proposed.In the scheme,the BGP Flowspec was enhanced to avoid reconfiguring the related routers one by one,and hence the network management was simplified and a more flexible flow scheduling method was provided.The proposed scheduling scheme is compatible with the traditional BGP,which matches the trend of current industry and solves some of the problems in traditional BGP scheme.
format Article
id doaj-art-5f00cca770b54cd19313cd8849f2fdf2
institution Kabale University
issn 1000-0801
language zho
publishDate 2016-03-01
publisher Beijing Xintong Media Co., Ltd
record_format Article
series Dianxin kexue
spelling doaj-art-5f00cca770b54cd19313cd8849f2fdf22025-01-15T03:24:48ZzhoBeijing Xintong Media Co., LtdDianxin kexue1000-08012016-03-0132202759800171Flow scheduling technology based on BGP extended protocolYujia LUOLiang OUZhiwei MOHong TANGA novel centralized flow scheduling scheme based on software defined networking(SDN)was proposed.The existing problems of current flow scheduling method based on BGP were analyzed,and a new scheme was proposed.In the scheme,the BGP Flowspec was enhanced to avoid reconfiguring the related routers one by one,and hence the network management was simplified and a more flexible flow scheduling method was provided.The proposed scheduling scheme is compatible with the traditional BGP,which matches the trend of current industry and solves some of the problems in traditional BGP scheme.http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2016113/flow schedulingBGPsmart pipe
spellingShingle Yujia LUO
Liang OU
Zhiwei MO
Hong TANG
Flow scheduling technology based on BGP extended protocol
Dianxin kexue
flow scheduling
BGP
smart pipe
title Flow scheduling technology based on BGP extended protocol
title_full Flow scheduling technology based on BGP extended protocol
title_fullStr Flow scheduling technology based on BGP extended protocol
title_full_unstemmed Flow scheduling technology based on BGP extended protocol
title_short Flow scheduling technology based on BGP extended protocol
title_sort flow scheduling technology based on bgp extended protocol
topic flow scheduling
BGP
smart pipe
url http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2016113/
work_keys_str_mv AT yujialuo flowschedulingtechnologybasedonbgpextendedprotocol
AT liangou flowschedulingtechnologybasedonbgpextendedprotocol
AT zhiweimo flowschedulingtechnologybasedonbgpextendedprotocol
AT hongtang flowschedulingtechnologybasedonbgpextendedprotocol