Application of Concrete Cutoff Wall to Extended Tiegang Reservoir Project
Saved in:
Main Author: | WU Shu-hong |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2009-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47661403&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Quality Control for Construction of Concrete Cutoff Wall of Dahe Reservoir
by: 朱存忠, et al.
Published: (2003-01-01) -
Application of Plastic Concrete in the Cutoff Wall of Fengtinghe River Main Dyke
by: 陈开凡
Published: (2001-01-01) -
Application of Concrete Cutoff Wall to Cofferdams Upstream and Downstream a Hydropower Station
by: YANG Fu-qiang
Published: (2009-01-01) -
Application of Water Jetting Method to Concrete Cutoff Wall Construction in Reinforcement of Beijiang Embankment
by: LIAO Bo-ying, et al.
Published: (2009-01-01) -
Application of Rotary Gunite Cutoff Wall in Deep Foundation Pit
by: 张义东, et al.
Published: (2005-01-01)