A MultiObjective Optimization Approach for Integrated Timetabling and Vehicle Scheduling with Uncertainty
The timetabling problem (TTP) and vehicle scheduling problem (VSP) are two indispensable problems in public transit planning process. They used to be solved in sequence; hence, optimality of resulting solutions is compromised. To get better results, some integrated approaches emerge to solve the TTP...
Saved in:
Main Authors: | Yindong Shen, Wenliang Xie, Jingpeng Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Journal of Advanced Transportation |
Online Access: | http://dx.doi.org/10.1155/2021/3529984 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The integration of optimizing train timetables with EMU route plans
by: Wenjun Li, et al.
Published: (2025-01-01) -
Multiobjective Day-Ahead Scheduling of Reconfigurable-Based Microgrids Through Electric Vehicles and Demand Response Integration
by: Ali Mirzaei, et al.
Published: (2025-01-01) -
Electric Ferry Fleet Peak Charging Power Schedule Optimization Considering the Timetable and Daily Energy Profile
by: Tomislav Peša, et al.
Published: (2024-12-01) -
A New Multiobjective Evolutionary Algorithm Based on Decomposition of the Objective Space for Multiobjective Optimization
by: Cai Dai, et al.
Published: (2014-01-01) -
Study on Multiobjective Modeling and Optimization of Offshore Micro Integrated Energy System considering Uncertainty of Load and Wind Power
by: Jun Wu, et al.
Published: (2020-01-01)